Thursday, June 24
Tuesday, June 22
Porch Project keeps us busy.
4 inch pine bead board tongue & grove went on the wall.
The ceiling has 4 inch tongue & grove cedar planks.
The old entry door and frame have been removed.
(We took it out to the street and put a free sign on it
and a few hours later it was gone.)
installed where the old door was.
The guys installed cedar shakes on what would have been the
exterior of the house before the porch.
White wash on the bead board, exterior paint color on the shakes.
The cedar ceiling we are going to leave for now and see if it will gray naturally.
When I'm done spilling paint, the guys will come back and install oak flooring.
Friday, June 4
Morning walk with Maui
Thursday, June 3
Roses and Renovations
The plan: put in insulated windows and door, rewire this whole end of the house (that includes part of the kitchen, the garage and out-door lights), new beadboard ceiling and walls and then lay down hardwood floors. Oh yes, we'll be building new temporary stairs because we are moving the door location. (The deck is next year.)
Wednesday, June 2
Tuesday, June 1
Subscribe to:
Posts (Atom)