Thursday, June 24
Tuesday, June 22
Porch Project keeps us busy.
The windows are trimmed with simple pine.
4 inch pine bead board tongue & grove went on the wall.
The ceiling has 4 inch tongue & grove cedar planks.
4 inch pine bead board tongue & grove went on the wall.
The ceiling has 4 inch tongue & grove cedar planks.
This view is from the kitchen.
The old entry door and frame have been removed.
(We took it out to the street and put a free sign on it
and a few hours later it was gone.)
The old entry door and frame have been removed.
(We took it out to the street and put a free sign on it
and a few hours later it was gone.)
This view is from the porch to the kitchen with the new window
installed where the old door was.
The guys installed cedar shakes on what would have been the
exterior of the house before the porch.
installed where the old door was.
The guys installed cedar shakes on what would have been the
exterior of the house before the porch.
Now it's my turn: Paint and Stain.
White wash on the bead board, exterior paint color on the shakes.
The cedar ceiling we are going to leave for now and see if it will gray naturally.
When I'm done spilling paint, the guys will come back and install oak flooring.
Friday, June 4
Morning walk with Maui
Thursday, June 3
Roses and Renovations
This rose bush planted long ago by the former owners; the Muzzeys, is like a gift from the past. Last year I think it had one or two blooms. I cut it back hard in the fall and gave her a new trellis and a little food. She has thanked us by providing 50 plus blooms this year.
The renovations are in full swing. The new screen door above goes into the basement. Another place for the indoor kitties to view the chippys and now much easier to bring out the laundry to hang on the line. We customized the size; 10 inches off the top and fit the cross piece back in and restrung the screening. I added heavy wire cloth to the bottom in case one of the cats tried to scratch their way out.
Something is missing!? We are making the back-porch into more than just a hallway. Down came the ceiling, off came the paneling on the walls, up came the rug and tiles on the floor and lastly the door and storm windows gone.
The plan: put in insulated windows and door, rewire this whole end of the house (that includes part of the kitchen, the garage and out-door lights), new beadboard ceiling and walls and then lay down hardwood floors. Oh yes, we'll be building new temporary stairs because we are moving the door location. (The deck is next year.)
The renovations are in full swing. The new screen door above goes into the basement. Another place for the indoor kitties to view the chippys and now much easier to bring out the laundry to hang on the line. We customized the size; 10 inches off the top and fit the cross piece back in and restrung the screening. I added heavy wire cloth to the bottom in case one of the cats tried to scratch their way out.
Something is missing!? We are making the back-porch into more than just a hallway. Down came the ceiling, off came the paneling on the walls, up came the rug and tiles on the floor and lastly the door and storm windows gone.
The plan: put in insulated windows and door, rewire this whole end of the house (that includes part of the kitchen, the garage and out-door lights), new beadboard ceiling and walls and then lay down hardwood floors. Oh yes, we'll be building new temporary stairs because we are moving the door location. (The deck is next year.)
Wednesday, June 2
Tuesday, June 1
Subscribe to:
Posts (Atom)